An intention of notification to manufacture concrete panels must be advised to the WorkSafe Commissioner at least 10 working days before the first panel is to be cast; this includes panels manufactured on the construction site or at a precast yard or factory. The notification must specify:
- where panels are to be manufactured
- the construction site at which panels will be used/installed.