Notification to manufacture concrete panels

Last updated: 20 March 2026

An intention of notification to manufacture concrete panels must be advised to the WorkSafe Commissioner at least 10 working days before the first panel is to be cast; this includes panels manufactured on the construction site or at a precast yard or factory. The notification must specify:

  • where panels are to be manufactured
  • the construction site at which panels will be used/installed.